Company overview - Mine2

MINE - I | MINE - IA | MINE - II

 

In February, 1978 Government of India sanctioned the Second Lignite Mine of capacity 4.7 MT of lignite per annum and in February 1983, Government of India sanctioned the expansion of Second Mine capacity from 4.7 Million Tonnes to 10.5 Million Tonnes. Further capacity expansion to 15 MT/A was sanctioned by Government of India in October 2004 and is presently under implementation.Unlike Mine-I, Mine-II had to face problems in the excavation of sticky clayey soil during initial stage. The method of mining and equipment used are similar to that of Mine-I.

This Mine is located 5 kms south of Mine-I, spread over an area of 26 sq.kms. with 390 million tonnes reserves. The initial mine cut was started in April 1981. The lignite seam was first exposed in September 1984 and regular lignite mining commenced from March 1985. The overburden thickness varies from 50-100 m and the lignite thickness varies from 8 to 22m. The average overburden to lignite ratio is 5m3 to a tonne. The lignite production in this mine meet the fuel requirements of Thermal Power Station-II. The method of mining and equipment used are similar to that of Mine-I.
 
The seam is the same as of Mine-I and is contiguous to it. The lignite seam in Mine-II was first exposed in September 1984 and the excavation of lignite commenced in March, 1985. The Last overburden system (surface bench system) under the expansion scheme was commissioned on 15.12.1991. The lignite excavated from Mine-II meets the fuel requirements of Thermal Power Station-II.
 
Mine II
Selected Mining Area 41.22 Sq.KM
Lignite Reserve 624 M.T
Thickness Of Overburden 45 to 103 Metres
Thickness Of Lignite 8 to 22 Metres
Project Sanctioned 22.02.1978
Cost Of The Project Rs. 278 Crores
Project Inaugurated July 1979
Project Commenced 14.04.1981
Initial Mine Cut Completed 16.06.1985
Lignite First Exposed On 30.09.1984
FIRST EXPANSION FROM 4.7 MTA to 10.5 MTA  
Project Sanctioned For 10.5 M.T Stage February 1983
Revised Cost Of Expansion Rs.1065.40 Crores : (Feb.'91)
Project sanctioned for 15.0 M.T Stage October 2004
Sl.No.
Equipment
Capacity
Mine-II
1 Bucket Wheel Excavator (BWE) Bridge Type 1400 L
3
2 BWE (Normal Type) 1400 L
2
3 BWE  
3.a a) with deep cut facility 700 L
2
3.b b) without deep cut facility 700 L
4
4 Mobile Transfer Conveyor 11,000 tph
2
5 Mobile Transfer Conveyor 4,700 tph
2
6 Spreader 20, 000 tph
2
7 Spreader 11, 000 tph
2
8 Tripper Car 20, 000 tph
2
9 Tripper Car 11, 000 tph
2
10 Stacker (Rail Mounted)  
1 (at TPS-II)
11 Reclaimer 2, 700 tph
2 (at TPS-II)

Conveyors in Mine - II

Width
Type of Belt
Length in Km
No. of drive heads
and total capacity
1800 mm Steel Cord 4.86 4 Nos.(11 x 350 KW)
2000 mm Steel Cord 20.41 29 Nos.(52 x 630 KW)
2400 mm Steel Cord 20.56 14 Nos.(53 x 1250 KW)
     